From NEW Water’s De Pere Facility, approximately 8 million gallons per day of wastewater are treated and discharged into the Fox River.
NEW Water’s treatment system is designed to meet effluent limits established by the Wisconsin Department of Natural Resources (WDNR), and those limits focus on protecting public health and the environment. As regulations and permit requirements change over time, NEW Water continuously plans for and invests in capital projects to ensure compliance and to maintain high-quality treatment standards.
Watch the video to learn more about the De Pere Facility.
As a wastewater treatment facility serving a large metropolitan area, NEW Water receives wastewater from a variety of sources, including industrial and commercial users. This wastewater may contain dyes, pigments, and other coloration and foam that are difficult to break down or remove using traditional wastewater treatment methods, and at times may be visible in treated effluent discharged to the river. Please note that as a working wastewater facility, odors may also be present.
NEW Water operates under a permit from the WDNR, which sets water quality limits for its discharges. Industrial users connected to the system are required to comply with applicable regulations and permit requirements.
Be safe! Out of an abundance of caution, it is always recommended that people recreating in any waterway do not drink or swallow the water, always rinse off afterwards, and contact a healthcare provider if they feel ill.
For safety, follow Wisconsin Department of Health Services (DHS), WDNR, and Centers for Disease Control and Prevention (CDC) recommendations for swimming in natural waterways.